Major Project Experience
Utility Boiler & Deaerator Replacement Project - Alberta, Canada
High-Level Scope
Installation of a new larger capacity package utility boiler and deaerator vessel and associated infrastructure (civil, foundations, structural, piping, mechanical, electrical, instrumentation, controls, etc.).
Project Responsibilities & Deliverables
Led all project development phases (study, DBM, FEED and detailed engineering) for this project. The major deliverables associated with this project included the development & completion of the following items:
Project charter; contract development including creation of technical specifications and RFP packages & negotiations for major equipment, pre-fabrication and construction services; project gate documentation (process study, DBM, FEED documentation); extensive laser scanning management, burner field testing; various 3D model reviews (30%, 60% & 90%), building and equipment layouts; construction work packages (civil, structural, architectural, mechanical, piping, electrical, instrumentation and controls based CWPs, Class 2 estimate including the basis of estimate documentation and Monte Carlo quantitative risk analysis; field installation work packages (FIWPs); level 5 schedule and associated schedule PERT analysis and DCMA 14-point schedule assessment; systems based turnover strategy; detailed project and construction execution plans; pre-construction contract development and negotiations, equipment preservation, engineering and field change management process creation & execution; project controls; earned value management including CPI, SPI and TCPI metrics; quality assurance and quality control; piping and structural steel pre-fabrication, field change management; and construction management of pre-construction execution.