Steam Reformer Various Replacement Projects - Alberta, Canada

High-Level Scope

Managed five projects as a program related to a client's methanol reformer that included the following scopes of work - Convection section replacements, burner management system installation, burner replacements, refractory replacement and combustion air upgrades.

 

Project Responsibilities & Deliverables

Led all project development phases (study, DBM, FEED, detailed engineering, execution and project closeout).  The major deliverables associated with this project included the development & completion of the following items:

Project charter; contract development including creation of technical specifications and RFP packages & negotiations for major equipment, pre-fabrication and construction services; project gate documentation (process study, DBM, FEED documentation); extensive laser scanning management; various 3D model reviews (30%, 60% & 90%); Class 2 estimate including the basis of estimate documentation and Monte Carlo quantitative risk analysis; Project Definition Rating Index (PDRI); systems based turnover strategy; detailed project and construction execution plans; equipment preservation; engineering and field change management process creation & execution; project controls; earned value management including CPI, SPI and TCPI metrics; quality assurance and quality control; piping and structural steel pre-fabrication; logic and controls pre-testing; pre-commissioning; pre-start up safety reviews (PSSRs); commissioning and start up; turnaround management and construction management of pre-construction and main construction execution.

Project Cost: $80M