Mega Project Experience
Urea Greenfield Plant & Ammonia Brownfield Facility Project - Texas, United States
High-Level Scope
Installation of a new 1,800 metric tonne per day (MTPD) urea plant, revamp of an existing ammonia plant, and major utilities and offsite (U&O) upgrades to existing electrical, steam generation, water treatment, cooling water, raw water systems, storage and rail systems.
Project Responsibilities & Deliverables
Led this project up to end of the design basis (DBM or FEL-2) phase. The major deliverables associated with this project included the development & completion of the following items:
Project charter; contract development including creation of technical specifications and RFP packages & negotiations for engineering and process licensor services; various project gate documentation including the process study and design basis memorandum documentation; initial environmental regulatory strategy; process hazard analysis (PHA); plant layout including buildings and major equipment; utility process and mechanical requirements; rail studies; Class 4 project estimate including all direct and indirect costs as well as basis of estimate documentation; project resourcing plans; preliminary project and construction execution plans; qualitative risk assessments (risk registers) and AFE phase development and submissions.